Pacific Rubiales has executed an agreement with Petrodorado South America for the earn-in of an additional participating interest in the Buganviles Block.
The scheduled drilling of the 45 day Zola-1 well has been delayed until November 2010 due to scheduling conflicts with the Stena Clyde rig.
Advertising
Roughneck Magazine 2010 Campaign
This Advertisement is featured in the Roughneck June 2010 issue, and illustrates 3 back-to-back field records acheived by a focused team using Drilformance PDC Drill bits.
Outstanding performance in the Montney region prompted this advertisement which demonstrates more exceptional horizontal results.
The versatile and eminently usable DF-513R is the product focus of this ad, which demonstrates superb vertical and build sections.
Roughneck Magazine 2009 Campaign
Drilformance Ran this Introductory Advertisement in the August 2009 Issue of the Roughneck Magazine. This Ad Outlined some of the fantastic Directional runs achieved by our customers.
Drilformance continued its introductory print campaign with an advertisement describing the usability and directional stability of their PDC drill bits.
The capstone Drilformance Print ad for 2009. Its Time to Call.